Home<Getting Help<Business Costs
 
 
Land Price and Quoted Price Table of Municipal Administration Facility
 

First, Land Price:

1. Land Price: 300,000 Yuan/Chinese acre (including: the compensatory payment of drafting, increases the cost of infrastructure incorporation of water supplying, drainage and rain, the cost of using the increasing land of infrastructure, the cost of flood prevention, the cost of taking farmland, the management fee of land; does not contain the costs of power facility the steam, the natural gas, the heating incorporation; Does not contain the land fees from sales.).
2. Land Fees from Sales: It is 20,000 Yuan/Chinese acre according to the government stipulation.
3. The land price may reach to 280,000 Yuan/Chinese acre if the project belonging to the bio-engineering and the medicine, the food processing, the electronic information and the auto component industry.

Second, Installation Fees by the Municipal Administration:

1. The installation fees for water: 8,000 Yuan/The Chinese acre (according to enterprise area containing drafted path greenbelt area)
2. The installation fees for sewage: 12,000 Yuan/The Chinese acre (according to enterprise area containing drafted path greenbelt area)
3. The installation fees for rain: 4,000 Yuan/The Chinese acre (according to enterprise area containing drafted path greenbelt area)
4. The installation fees for power facility: 150 Yuan/KV (according to the telegram load of the enterprise)
5. The entering net fees for heating: 60 Yuan/The square meter (according to the area of the building of the enterprise)
6. The installation fees for steam :180,000 Yuan/Steams ton per hour
7. The installation fees for natural gas: 4,000 Yuan/Cubic meter per hour (the quantity which reported by user in rush hour as the price standard of natural gas entering net)
Third, Quoted Price in Later Period of Working:

Third, Quoted Price in Later Period of Working:
1. Price of water supplying: 4.1 Yuan/The ton (carries out by the unified standard in Beijing)
2. Price of drainage: 1.5 Yuan/Ton
3. Price of heating: 16.5 Yuan/Square meter (below 4 meters of floor)
33 Yuan/Square meter (above 4 meters of floor)
4. Price of steam: 145 Yuan/Steams the ton (according to the quantity per hour)
5. Price of natural gas: 4.1 Yuan/Cubic meter
6. The price of power is according to the Beijing unified standard.

Note: Each price of the infrastructure adjusts according to the price standard of Beijing.
 